管道隐藏工程验收及格后,应停止沟盖施工。在笼罩泥土之前,必需肃清槽底的杂物,如砖块等。
在气密性实验之前,除了能够裸露讨论局部外,管道两侧的管顶(不小于0.5m)必需回填。气密性实验停止后,应实时回填其他局部;
在回填进程中,罐内不得有水,不得有水回填。雨季排水艰苦时,应采用办法将卑鄙管道与回填土衔接起来,避免管道漂移。首先,对管道顶部停止回填(至少0.5米)并夯实。
管道、测验井等构造两侧的沟槽应答称地回填,确保存道与构造之间不偏向;
管道底部至顶部0.5m范畴内,必需采用人工回填,严禁机器回填。
当管顶经由过程机器回填超越0.5m时,应同时从管道轴线两侧平均地停止,并停止夯实跟压实。
当沟槽由钢板桩支持时,钢板桩可在回填到达划定高度后移除。撤除后,应实时回填桩孔,并采用办法添补桩孔。应用填砂时,能够用水冲刷;它也能够在拉桩时用于灌浆;
沟槽回填时应严厉把持管道的垂直变形。当管道直径较大,管顶土较高时,可在管道内设置常设支护或预变形。
After passing the acceptance of the pipeline concealment project, the construction of the ditch cover should be stopped. Before covering the soil, it is necessary to clear the debris at the bottom of the tank, such as bricks.
Prior to the airtightness experiment, in addition to being able to discuss parts of the exposed, the top of the pipe on both sides of the pipeline(not less than 0.5 M) must be backfilled. After the gas tightness experiment is stopped, other parts should be backfilled in real time;
During the backfilling process, there shall be no water in the tank or backfill. During the rainy season, when drainage is difficult, a method should be adopted to link the dirty pipes with the backfill soil to avoid pipeline drift. First, the top of the pipe is stopped backfilling(at least 0.5 meters) and compacted.
The grooves on both sides of the structure, such as pipelines and test wells, are returned to the ground to ensure that there is no bias between the channel and the structure;
Manual backfilling must be used for 0.5 M bottom to top of the pipeline, and machine backfilling is strictly prohibited.
When the top of the pipe surpasses 0.5 M via the process machine, it should stop evenly from both sides of the pipe axis and stop compacting and compacting.
When the groove is supported by a steel plate pile, the steel plate pile can be removed after backfilling to a defined height. After removal, the pile hole should be filled in real time, and the method is adopted to fill the pile hole. When using sand filling, it can be washed with water; It can also be used for grouting when pulling piles;
The vertical deformation of the pipeline should be strictly controlled when the groove is filled back. When the diameter of the pipe is large and the top soil of the pipe is high, permanent support or pre-deformation can be set up in the pipe.